Fire Prevention

 
<Public Safety <VFD <Fire Prevention
Vision Statement
Municipal Court
Grape Vine
Forms & Pubs
FAQ
copyright © City of Vineland, 2002- 2005

U.S. FIRE ADMINISTRATION

NATIONAL ARSON PREVENTION INITIATIVE

BOARD UP PROCEDURES

STOP the use of empty buildings as targets for arsonists, as crack houses as hang outs for gangs, as garbage dumps, and as temporary shelters for the homeless. 

These procedures are intended to protect buildings that are temporarily vacant pending rehabilitation and use.

“HARDENING THE TARGET” BOARD UP PROCEDURES:

Protecting valuable buildings from the weather from illegal entry can be accomplished by improving security, organizing block watches, improving lighting, periodic patrols, and by following these directions.

1.      DISCONNECT ALL UTILITIES AT THE STREET

A.     Turn off water at the street and drain the system to its lowest point. Leave faucets open and put anti-freeze in all traps containing water.

B.     Have the utility company disconnect electricity at the street and remove and cap meters.

C.     Shut off LNG supply at the street. Disconnect and remove LPG and heating oil tanks.

2.      REMOVE ALL  FLAMMABLES AND COMBUSTIBLES FROM INSIDE AND OUTSIDE THE BUILDING

A.     Remove all upholstered furniture, combustible materials and trash from the building, including he basement and attic.

B.     Remove trash and trash containers and combustible furniture from exterior stairwells, porches, fire escapes and outbuildings.

C.     Remove shrubbery and vegetation that could support or spread a fire.

3.      SECURE THE BUILDING TO PREVENT ENTRY

A.     Search the entire building to ensure that it is unoccupied.

B.     Remove doors and storm windows and place in storage.

DETERMINING HOW MUCH PROTECTION IS NEEDED

1.      Opening in the basement, first floor doors and windows and any point of entry accessible from a porch, fire escape or other potential climbing point require additional security measures. These openings should be barricaded with plywood, 2x4s, bolts and nails.

2.      Openings that are at least 10’ from ground level which are not accessible from a porch, fire escape, roof, or other climbing point can be secured with mails in each brace, and every 12” around the perimeter. For these openings snugly against the exterior frame, butting up to the siding on wood frame buildings and up to the brickwork on brick buildings. It may be necessary to remove the staff bead so this fit can be flush and tight.

BOARDING UP

1.      Cut plywood to fit over the window and door openings, flush with outside of the molding.

Note: For buildings with metal door and window frames

    the alternative is to cut the plywood 2x4s to fit the

           Inside of the door frame butted up against the band molding. 

2.      Cut the 2x4s to fit the horizontal dimension of the plywood. You will need two 2x4 exterior and two interior braces for each window and three sets for each door. For buildings with metal doors and window frames the 2x4s for the outside will be cut to the dimensions of the plywood, fitting inside the door frame, against the band molding. For the inside the 2x4s will be cut to the outside dimension of the door or window frame.

3.      Pre drill 3/8th inch holes in the plywood and the braces.

4.      The holes will be placed approximately 1/3 of the length of the brace from each outside edge of the door and window jam.

5.      The two window braces will be places 1/3 of the length of the brace from each outside edge of the door and window jam.

6.      The three door braces will be placed; one in the center of the doorway, and one half the distance from the center to the top and to the bottom of the doorway.

7.      Place the plywood over the exterior opening and nail to the frame.

For metal frames place the plywood and braces

inside the frame against the band molding.

8.      Place the 2x4 braces over the interior and exterior of the door or window.

9.      Place the large washer over the carriage bolt and place the bolt through the holes.

10.  Place washer and nut inside and tighten securely. Torque the nut so that it slightly compresses the interior 2x4.

After all entrances are secured, the interior worker should exit the building, using a ladder. Through a window, if such exists, at least 10 feet above the ground. Nail or screw a plywood sheet over the worker’s exit. Patrol the building periodically to check the security.

TO REQUEST ARSON PREVENTION MATERIALS:

National Arson Prevention Clearinghouse

16825 South Seton Avenue

Emmitsburg, Maryland 21727

1-800-603-3100

Materials available include:

 MATERIALS NEEDED

  A.   ½” plywood, grade CDX and 2” x 4” by 8’ construction grade lumber.

B.   3/8” by 12” carriage bolts (rounded head o weather side).

  C.   3/8” construction grade nuts.

  D.   Flat washers with an inside diameter large enough to bypass the wrench neck inside the carriage bolt head so no lift edge is available beneath an installed carriage bolt head.

  E.   ½” diameter flat washers for installation beneath the nut inside the building.

  F.    1-5/8” (6d) galvanized or stainless steel ring-shank nails or comparable deck nails.